![225mm, 230mm, 235mm Width Scaffolding LVL Wooded Board Osha Scaffolding Plank](/uploads/s/e4e441af900d4aa08f8d3ac6344aba04.webp)
225mm, 230mm, 235mm Width Scaffolding LVL Wooded Board Osha Scaffolding Plank
Overview Lvl scaffolding plank Product Description Laminate Veneer Lumber (LVL) Scaffold Plank LVL scaffold board is an
Send your inquiryDESCRIPTION
Basic Info
Material | New Zealand Radiate Pine |
Grain | Straight Grain |
Bonding Strength | I(NQF) |
Plywood Type | 18-Ply |
Formaldehyde Emission Standards | E0 |
Specifications | 38mm/42mm*225mm*Length |
Place of Origins | China |
Grade | Excellent Grade |
Usage | Indoor, Outdoor, Construction |
Mc | 8%-12% |
Glue | 100% WBP Glue/Melamine Glue |
Thickness | 38mm /42mm |
Density | 560-610kgs/Cbm |
Standard | Osha Middle Duty/ Heavy Duty As1577 |
Certificate | CE Standard/SGS |
OEM | Painting/Logo/Osha Embossed |
Joint | Scarf Joint |
Transport Package | Pallets with Film |
Trademark | Total Contec |
Origin | China |
HS Code | 441299 |
Production Capacity | 3000 Cubic Meter/Cubic Meters Per Month |
Product Description
Lvl scaffolding plank
Laminate Veneer Lumber (LVL) Scaffold Plank
LVL scaffold board is an environmental-friendly wood product which is made of New Zealand pine veneer and WBP (phenolic)Glue,offering high durability and strength.It is up to standards of OSHA Middle Duty and heavy Duty AS 1577.
Product Name | High quality LVL scaffolding wood plank for construction |
Core | Pine, Radiata Pine |
Moisture Content | below 15% |
Dimensions | Thickness: 38mm,42mm etc. |
Width: 225mm, 230mm, 235mm etc. | |
Length: 0.5m,0.6m,0.9m,1.2m, 1.5m,1.8m, 2m,3.9m, 4m, 6m etc. | |
Tolerance | T&W: ±1mm; L: ±2 |
Glue | Melamine glue, WBP glue, Phenolic glue etc. |
Formaldehyde emission | E2, E1 etc. |
Surface | Surface sanding, edges chamfer |
Painting | Green, Yellow or customize |
Joint Way | Overlap joint, scarf joint, finger joint etc |
Certification | ISO9001, CE, SGS, JAS, FSC etc. |
Packing | Standard export pallet with strip20GP-----About 25CBM40HQ-----About 50CBM |
Trade Terms | FOB, CFR, CIF, EXW |
Delivery time | 15-20 days after receiving deposit |
Application | Scaffolding , contruction etc. |
Packaging & ShippingRelated Products
Related Products
-
Construction Aluminium Mobile Tower System Plank Frame Steps Set Scaffold
-
HDG Guardrail Post Walkthrough/Masonry/End Frame Scaffolding/Scaffolding System
-
Cheap Factory Direct Supply Galvanized Adjustable Steel Scaffolding Prop Jacks Price
-
45 Degree Elbow Hope Hot Melt Pipe Fittings DN63-630 Effective Length 63-220mm