![HDG Guardrail Post Walkthrough/Masonry/End Frame Scaffolding/Scaffolding System](/uploads/s/53bca01fa95e45518ad185a9322d2bd6.webp)
HDG Guardrail Post Walkthrough/Masonry/End Frame Scaffolding/Scaffolding System
Overview Product Description GUARDRAIL POST FOR FRAME SCAFFOLDING The guardrail post fits frame scaffold. It is used to
Send your inquiryDESCRIPTION
Basic Info
Model NO. | Multiple Size |
Lapping Form | Full Scaffolding |
Erection Position | External Scaffolding |
Move Method | Attached Lifting Scaffolding |
Scaffolding Part Type | Scaffolding Frames |
Construction Properties | Installation Scaffold |
Transport Package | Rack |
Specification | 1419MM |
Origin | China |
Production Capacity | 30000ton/Year |
Product Description
GUARDRAIL POST FOR FRAME SCAFFOLDING
The guardrail post fits frame scaffold. It is used to install with guardrail that prevent accident falls. This design has an extra brace at the bottom to makes it stronger and moves less than standard posts without a kicker.Our Guard Rail Post Scaffoldings are compatible with most common frame scaffolds in the scaffolding market.
MAIN MATERIAL: OD42.7 x 2.3mm
SPECIFICATION&MODELS:
Product Code | Description | Length(mm) | Weight(KGS) |
GRPT | Guardrail Post | 1419 | 4.5 |
WUXI JTX METAL CO.,LTD is a specialized manufacturer working on producing various scaffoldings. We have established more than 8 years and have long-term cooperation with customers from North America, East Asia, Oceania etc.
Our factory provides high quality scaffoldings and professional technical support to ensure you can get perfect items and easy to use them.
We have standard system scaffoldings, frame scaffoldings and accessories can be chosen, or you can get them by custom-made.
Q: Are you a trading company or factory?
A: We are a factory.
Q:Where is your factory and the normal loading port?
A:Jiangsu
And the loading port usually will be SHANGHAI PORT
Q:How long will be taken to produce after ordering?
A: About 35 days.
Q:Can I get some samples?
A: YES. The sample will be free but you may bear the cost of delivery.
Q:What is your payment term?
A:30% T/T in advance, balance before shipment.
IF YOU HAVE ANY FURHTER QUESTION, please be free to contact me
Related Products
-
Scaffolding Plank for Scaffolding System/ Scaffolding Platform Steel Plank
-
ISO Good Hot DIP Galvanized Steel Beam System Aluminium Aluform Beam Steel Beam Beam Aluminium Beam Beam Formwork Scaffold
-
Galvanized and Painted Frame Scaffolding
-
High Presssure Ms CS Seamless Tube Price API 5L ASTM A106 Seamless Carbon Steel Pipe