![En12811 Certified Layher Allround Ringlock Scaffolding/Scaffold System](/uploads/s/a8206b210a3a467d83a7b4b55392a9e9.webp)
En12811 Certified Layher Allround Ringlock Scaffolding/Scaffold System
Q1: Are you a factory or trading company? A: We are a factory specializing in manufacturing all kinds of scaffolding mat
Send your inquiryDESCRIPTION
Basic Info
Model NO. | ST385 |
Lapping Form | Full Scaffolding |
Erection Position | External Scaffolding |
Move Method | Installed and Fixed |
Scaffolding Part Type | Scaffolding Parts |
Construction Properties | Building Scaffold |
Surface Treatment | Hot Dipped Galvanized/Pre-Galvanized |
OEM/ODM | Available |
Validity | More Than 15 Years |
Thickness | 2.75mm/3.2mm |
Delivery | About 10-20 Days After Deposit |
Factory Certificate | ISO9001 ISO4001 ISO45001 |
Certificate | Ce/SGS |
Application | Building/Tunnel/Bridge Construction |
Raw Material | Steel Q355b,Q235B |
Color | Silver Red Blue Grey |
Connect Method | Wedge Lock/Ring Lock |
Way of Quoting | by Piece or by Weight |
Sample | Available |
Business Type | Manufacturer and Exporter |
Loading Port | Tianjin or Qingdao |
Transport Package | Steel Rack |
Specification | 500mm 1000mm 1500mm 2000mm 2500mm 3000mm |
Trademark | HDRL |
Origin | China |
HS Code | 73084000 |
Production Capacity | 500 Tons/Day |
Product Description
Q1: Are you a factory or trading company?
A: We are a factory specializing in manufacturing all kinds of scaffolding material.
Q2: Where is the loading port?
A: Qingdao Port or Tianjin(Xingang) Port.
Q3: What's the MOQ of the product?
A: Different item has different MOQ. Normally one Container is preferred.
Q4: What certificates do you have?
A: We have ISO 9001, ISO 14001, CE, SGS certification.
Q5: Can I get some samples?
A: Yes, usually the customer will pay for the cost and freight charge.
Q6: Do you have an OEM service?
A: Yes. We can provide OEM and ODM services as your requirements.
Q7: How long is the production cycle after ordering?
A: General it is about 15-30 days, according to different quantity requirement.
Related Products
-
Scaffolding Frame for Construction Price List of Scaffolding Material Shoring Frame
-
Carbon Steel Tube Ss330 Sm400A E275A S235jr S235j Seamless Tube and Industrial Welded Pipe S10c Ck45 C50e4 S25c S50c S53c C40e4 Carbon Steel Pipe for Customized
-
Wholesale Seamless Stainless Steel Pipe 316L 304 309S 310S 316L Heat Exchanger Tube Stainless Steel Pipe
-
Adjustable Steel Prop 1800mm-3200mm Shoring Prop for Aluminum Formwork System Construction