![Scaffolding Mason Frame Scafolding Ladder Scaffoldings Tower Scaffolding Mason Frame for Construction](/uploads/s/89fad20ad0664dfc8d2e94783c5b5be6.webp)
Scaffolding Mason Frame Scafolding Ladder Scaffoldings Tower Scaffolding Mason Frame for Construction
Overview Product Description Detailed Photos Packaging & Shipping To better ensure the safety of your goods, professiona
Send your inquiryDESCRIPTION
Basic Info
Model NO. | Frame Scaffolding |
Supporting Mode | Projecting Scaffolding |
Lapping Form | Double Scaffolding |
Erection Position | External Scaffolding |
Move Method | Attached Lifting Scaffolding |
Scaffolding Part Type | Scaffolding Frames |
Construction Properties | Building Scaffold |
Certificate | ISO9001, SGS |
Hscode | 7308900000 |
MOQ | 50 Sets |
Surface Treatment | Paint, Galvanized |
Width | 914/1219/1524/1930mm |
Height | 1524/1700/1930/2030mm |
Raw Material | Q235 Steel Pipe |
Technique | CO2 Arc Welding |
Thickness | 1.6/1.8/2.0/2.2/2.5/3.0mm |
Lead Time | 15 Days After Confirmed Deposit |
Application | Construction Building |
Product Name | Scaffolding System Construction Frame Scaffolding |
Package | Bundle or Bulk as Required |
Place of Origin | Tianjin |
Transport Package | Bundle and Bulk |
Specification | 1219*1700/1800/1900 |
Trademark | ZHIYI(20 years Manufacturing experience) |
Origin | Tianjin, China |
HS Code | 7308900000 |
Production Capacity | 50000 Pieces Per Years |
Product Description
Product DescriptionMaterial | Q195~235 |
Surface treatment | Paint,Pre-galvanizing |
Regular size | (1) 1.7M*0.95M*1.82M (2) 1.7M*1.25M*1.82M (3) 1.8M*0.95M*1.82M |
Component parts | Frame:2 pieces+Cross brace:2 sets+Joint pin:4 pieces |
20GP loading capacity | 100~120sets |
40HQ loading capacity | 350~450sets |
Material | Q195~235 |
Surface treatment | Paint,Pre-galvanizing |
Regular size | (1) 1.7M*0.95M*1.82M (2) 1.7M*1.25M*1.82M (3) 1.8M*0.95M*1.82M |
Component parts | Frame:2 pieces+Cross brace:2 sets+Joint pin:4 pieces |
20GP loading capacity | 200~230sets |
40HQ loading capacity | 500-550sets |
Material | Q195~235 |
Surface treatment | Paint,Pre-galvanizing |
Regular size | (1) 1.7M*0.95M*1.82M (2) 1.7M*1.25M*1.82M (3) 1.8M*0.95M*1.82M |
Component parts | Frame:2 pieces+Cross brace:2 sets+Joint pin:4 pieces |
20GP loading capacity | 150~250sets |
40HQ loading capacity | 350~550sets |
To better ensure the safety of your goods, professional, environmentally friendly, convenient and efficient packaging services will be provided.
Related ProductsCompany ProfileTianjin Zhiyi Metal Products Co. Ltd was founded in 2002, which holds ten million RMB registered capital. Our company is located in Tianjin, a port city in northern China, and its covers an area of 27000 square meter
Our company was specialized in the design and manufacture of metal products. The products of our factory have always been wildly recognized by both abroad and domestic customers in the past ten years. In the year 2008, our company was officially designated as the main supplier of assistant project by Tianjin government. And our products that were exported to west Asia and South American was wildly popular among our customers.The main metal products produced by our company include steel props, scaffolding, steel plank , LvL plank , plywood,Base jack, scaffolding coupler, formwork accessories, galvanized pipe ,H20 beam,ground screw, solar stand, C / Z /H section steel , other building material etc.Our company has professional managerial personnel and well-qualified technical team. From the very start of our company, we always insist on the concept of "Innovation, quality, service, economy, dedication, and apparition." Believing products quality can be our vitality, time will prove our reputation and reasonable price is our competitiveness, our company stands tall in the economic capital of north China.
How to buy your ideal products?
You can provide us your drawing, and we will produce as your drawing.
Or we can design as your requirements if you do not have a clear plan.
How to pay?
TT and L/C are acceptable and TT will be more appreciated.
What is the delivery time?
It depends on order quantity.
Generally, the delivery time will be within 15 to 30 days.
How about our product quality?
Our steel prop piles are manufactured with first quality materials
What is steel quality?
This system is built from Q235 steel conical pipe with welded blades,
and can be applied in a wide variety of different geological locations.
How to order from Zhiyi ?
Buyer Send Enquiry →Get Zhiyi Quotation → Order Confirmation
→ Buyer Arrange 30% Deposit → Production Started upon Receipt of Deposit
Related Products
-
Construction Building Material Mideast Steel Prop Galvanized Painted Acro Jack Formwork Shoring Heavy Duty Steel Prop Scaffolding Steel Prop for Formwork
-
Used Props Scaffolding Frame for Building Factory Price Steel Formwork Manufactory in China
-
High Presssure Ms CS Seamless Tube Price API 5L ASTM A106 Seamless Carbon Steel Pipe
-
Scaffolding Drop Forged Double Coupler British Style