Painted Adjustable Shoring Prop Doka
Overview Our Advantages a.Your inquiry related to our product & price will be replied within 24hours. b.Well-trained & e
Send your inquiryDESCRIPTION
Basic Info
Model NO. | prop doka |
Supporting Mode | Floor Type Scaffolding |
Lapping Form | High Formwork |
Erection Position | External Scaffolding |
Move Method | Horizontal mobile Scaffolding |
Scaffolding Part Type | Scaffolding Frames |
Construction Properties | Building Scaffold |
Surface Treatment | DIP Painted/Powder Coated/Hot-DIP Galvanized |
Techinique | CO2 Arc Welded |
Color | Red/Silver/Orange or Customized |
Working Life | 5-7 Years |
Outer Tube Diameter | 48/56/60mm |
Inner Tube Diameter | 40/48mm |
Thickness | 1.6/1.8/2.0/2.2/2.5/3.0mm |
Length | 1600-4000mm |
Application | for Slab and Formwork Support |
Certificate | Ce, ISO |
Transport Package | in Bare Package |
Specification | Customized |
Trademark | Jianyi |
Origin | Foshan |
HS Code | 7308400000 |
Production Capacity | 1000 Tons Per Day |
Product Description
Our Advantages
a.Your inquiry related to our product & price will be replied within 24hours.
b.Well-trained & experienced staffs are to answer all your inquiries professional in English of course.
c..All of our goods will pass THREE QUALITY INSPECTIONS before shipment.
d.Excellent quality and Competitive price,OEM is highly welcomed.We have strong R&D team here to help.
e.Less than one container loading is accepted
f.On time delivery, in general 25-40 days.
g.Best after sale service, customer can follow their order situation any time, no matter on product line, warehouse or shipment.
Function of Steel Prop Scaffolding
Steel Prop Scaffolding is a individual pipe support for interior concrete floor. For decades, Steel Prop Scaffolding is still the first choice by building contractors for the following reasons:
1.Fully adjustable, no working height limit.
2.Easy to erect and dismantle,labour and time saving.
3.High supporting capacity.
4.No ledger, flexible to erect anywhere
5.Economical to use.
Details of Adjustable Steel Prop Scaffolding:
Middle East Type Prop (48/60)
Code | Material | Adjustable Height(mm) | Outer Tube OD(mm) | Thickness(mm) | Surface Treatment |
PM1629 | Steel | 1600-2900 | 60 | 1.8/2.0/2.2/2.5/3.0 | Hot Dip Galvanized(HDG); electrogalvanized; powder coated; dip painted |
PM1832 | Steel | 1800-3200 | 60 | 1.8/2.0/2.2/2.5/3.0 | Hot Dip Galvanized(HDG); electrogalvanized; powder coated; dip painted |
PM2035 | Steel | 2000-3500 | 60 | 1.8/2.0/2.2/2.5/3.0 | Hot Dip Galvanized(HDG); electrogalvanized; powder coated; dip painted |
PM2240 | Steel | 2200-4000 | 60 | 1.8/2.0/2.2/2.5/3.0 | Hot Dip Galvanized(HDG); electrogalvanized; powder coated; dip painted |
1.Fully adjustable, no working height limit.2.Easy to erect and dismantle,labour and time saving.3.High supporting capacity.4.No ledger, flexible to erect anywhere5.Economical to use.
Details:
Name | Painted adjustable shoring prop doka |
Place of Origin | Guangdong China |
Brand name | Foshan |
Size | 1600-2900/1800-3200/2000-3600/2200-4000mm or as your request |
Main Material | Q235 steel tube |
Surface Treatment | Galvanized,Dip Painting,Powder coated |
Color | Silver,Orage,Duck red or as your request |
Certificate | SGS |
Service | OEM Service available |
MOQ | 50pieces |
Payment | T/T.L/C |
Delivery Time | About 7-10 days after confirmation |
Packing | in bulk or steel pallet or as your request |
production capability | 100 tons per day |
Manufactory Location | Foshan,China. |
Product Description
Adjustable Mechanical Prop Jack Scaffolding/Steel Support For Construction
main products
Detailed Photos
recommend products
https://fsjianyi.en.made-in-china.com/product-group/beNAoFaHMPkd/prop-catalog-1.html
Certifications
FAQ
Q: Are you a real factory or a trading company?
A: We are of course a factory with three production lines and various machines ,Our factory is located in Guangdong, Province,Foshan.
Q: What is your main product?
A: Our factory main products include adjustable steel prop, frame scaffolding, ringlock scaffolding, quicklock scaffolding, cuplock scaffolding, kwikstage scaffolding, steel pipes & couplers, steel formworks,plywood, formwork clamps, adjustable U head jack & jack base, and other scaffolding&formwork accessories. wheel buckle scaffolding with the specifications of DMJ.
Q:How can we visit your factory?
A:By high speed rail to foshan city,or by air to Guangzhou baiyun airport. You can inform us the arriving time and we will arrange driver to pick u up.
Q: What kind of certificate do u provide?
A: ISO9001,CE,SGS and If you want to have a product quality test also support.
Q: What about delivery time?
A: Often by sea need 7-15 days after confirm.
Q:What about sample fee?
A:We can supply the sample if we have ready parts in stock, but the customers should pay for the sample cost and freight.
Contact us:
If you have any questions, pls feel free to contact us,
Any your requirements will be highly appreciated!
Contact: Brian Zhang
Related Products
-
Best Price Scaffolding Catwalk Plank of BS Osha Grade Laminated LVL Australia Scaffold Plank
-
Hot Selling Galvanized Steel Round Pipe Structural Steel Tube Scaffold Galvanize Pipe in Stock
-
20mm 50mm 100mm 300mm 500mm 610mm Building Material Black Carbon Casing Steel Pipe for Greenhouse/Scaffolding/Furniture
-
Easy 5% off Scaffolding Galvanized 32/34/48mm Hollow Solid Screw Jack Base/ U Head/ Base Jack