Multi-Purpose 1000 Pound Hot Sale Wood Timber Beam Steel Prop Supporting Head for Scaffolding Formwork Building Support
Overview Product Description Packaging & Shipping Company Profile Tangshan Wufang Industry Co., Ltd, with an investment
Send your inquiryDESCRIPTION
Basic Info
Certification | ISO, CE |
Material | Steel |
Type | Beam Formwork |
Raw Material | Steel |
Base Board | 148*232*5mm |
Angle Steel | 30*30*195*3mm |
Tube | 31.6*2.0*140mm |
Surface Finish | Powder Coated, Galvanized |
Transport Package | by Buddle or in Pallet |
Specification | or as request |
Trademark | WUFANG |
Origin | China |
HS Code | 73084000 |
Production Capacity | 20000 Meters/Month |
Product Description
Packaging & Shipping
Company Profile
Tangshan Wufang Industry , with an investment of U.S. Dollars of 8 million, is a professional manufacturer engaged in the design, production & sale of scaffolding systems.1. Location: Tangshan Wufang is leading scaffolding manufacturer, located in Tangshan, Hebei Province, the raw material basement.2. Team: We have professional team for sale, project design and construction.3. Main products: Ringlock Scaffolding, Frame Scaffolding, Steel Plank, Catwalk, Ladders, Pipe & Clamp, Steel Prop, H20 Beam, Aluminium Beam, etc.4. Production capacity: 7000-10000 Tons/month.5. Loading capacity: 8-12 containers/day.6. Delivery time: 10-15 days for 3-5 containers.Fast delivery to satisfy your urgent project demand.
FAQ
Q1: Are you a factory or trading company? A: We are a factory specializing in manufacturing scaffolding material.Q2: Where is the loading port?
A: Qingdao Port.
Q3: What's the MOQ of the product?
A: Different item has different MOQ. Normally one Container is preferred.Q4: What certificates do you have?
A: We have ISO 9001, SGS certification.Q5: Can I get some samples? A: Yes, but usually the customer will pay for the cost and freight charges. Q6: Do you have an OEM service?
A: Yes. We can provide OEM and ODM services as your requirements.Q7: How long is the production cycle after ordering?
A: General it is about 15-30 days, according to different quantity requirement.
Related Products
-
Galvanized Layher Metal Scaffold Scaffolding Steel Plank
-
American Standard High Quality Aluminum Plank for Scaffold Tower
-
Allround Ringlock/Kwikstage/Cuplock Steel Galvanized Scaffolding Adjust Base Jack for Sale
-
ASTM A106/A53 API 5L Gr. B Cold Rolling/Hot Rolling Seamless Steel Pipe From 21mm to 609.6mm