Head/Base Jack of Ringlock Scaffold with SGS/Ce Certificates
FAQ: Q1: Are you a factory or trading company? A: We are a factory specializing in manufacturing all kinds of scaffoldin
Send your inquiryDESCRIPTION
Basic Info
Erection Position | External Scaffolding |
Move Method | Attached Lifting Scaffolding |
Scaffolding Part Type | Scaffolding Frames |
Construction Properties | Building Scaffold |
Surface Treatment | Hot DIP Galvanized/Pre-Galvanized |
OEM/ODM | Available |
Validity | More Than 20 Years |
Thickness | 2.75mm/3.2mm |
Delivery | About 20-30 Days After Deposit |
Factory Certificate | ISO9001:2015 |
Product Certificate | SGS,Ce |
Application | Building/Tunnel/Bridge Construction |
Raw Material | Steel Q355b,Q235B,Q195 |
Color | Silver/Red/Blue/Grey |
Connect Method | Wedge Lock/Ring Lock |
Way of Quoting | by Piece or by Weight |
Sample | Available |
Business Type | Manufacturer and Exporter |
Transport Package | Steel Pallet |
Specification | 0.5M/1.0M/1.5M/2.0M/2.5M/3.0M/4.0M |
Trademark | HDRL |
Origin | China |
HS Code | 730840 |
Production Capacity | 300000 Tons Per Year |
Product Description
FAQ:
Q1: Are you a factory or trading company? A: We are a factory specializing in manufacturing all kinds of scaffolding material.Q2: Where is the loading port?
A: Qingdao port or Tianjin portQ3: What's the MOQ of the product?
A: Different item has different MOQ. Normally one pallet is preferred.Q4: What certificates do you have?
A: We have ISO 9001, ISO 14001, CE, SGS, and TUV certification.Q5: Can I get some samples? A: Yes, Sample is free, but usually the customer will pay for the shipping cost. Q6: Do you have an OEM service?
A: Yes. We can provide OEM and ODM services as your requirements.Q7: How long is the production cycle after ordering?
A: General it is about 20-30 days.Q8: What is the payment methods?
A: T/T payment is preferred and other payment terms is accepted.
Related Products
-
Ss Stainless Steel Threaded Pipe Fittings 150lb
-
Q195 Q195b ASTM JIS G3466 Carbon Steel ERW Welded Galvanized Steel Pipe for Scaffolding and Construction
-
Polypropylene PPR Pipe and Fittings for Hot/Cold Water Supply Pipe
-
Wholesale Seamless Stainless Steel Pipe 316L 304 309S 310S 316L Heat Exchanger Tube Stainless Steel Pipe