Frame /Ringlock Scaffolding Adjustable Hollow Solid Screw Jack Base/ U Head/ Base Jack and Fork Head Jack Leveling Jack

Products

HomeHome / Products / Base Jack / Details
Frame /Ringlock Scaffolding Adjustable Hollow Solid Screw Jack Base/ U Head/ Base Jack and Fork Head Jack Leveling Jack

Frame /Ringlock Scaffolding Adjustable Hollow Solid Screw Jack Base/ U Head/ Base Jack and Fork Head Jack Leveling Jack

Overview Product Description Packaging & Shipping Packing: 1. Generally, the total net weight of loaded container is 22

Send your inquiry

DESCRIPTION

Basic Info
Model NO. 34*4*400
Supporting Mode Floor Type Scaffolding
Lapping Form Double Scaffolding
Erection Position External Scaffolding
Move Method Horizontal mobile Scaffolding
Scaffolding Part Type Scaffolding Props
Construction Properties Installation Scaffold
Name Adjustable Shoring Prop (Heavy Duty/Light Duty Sho
Size 34*4mm
Other Size 38*4mm/48*4mm
Length 400mm
Surface Painted/Galvanized
Color Red/Green/Silver
Certificate ISO
Transport Package Pallet
Specification 34*4*400mm
Trademark JDG
Origin Hebei, China
HS Code 7308400000
Production Capacity 5000/Month
Product Description

Product Description

Product name
HDG Scaffolding Accessory Adjustable Hollow Screw Jack Base U head
MaterialCarbon Steel
Plate Size120*120*4mm, 150*150*5mm, 150*120*4mm
Size34*4*400mm, 38*4*400mm, 48*4*600mm,
Surface Treatmentgalvanized zinc ,hot dip galvanized, painting
M.O.Q100pcs
Packingpallet
Business typeManufacturer
CertificationISO
NotesSpecial marks can be printed according to requirements
It is available to produce by customer drawing

Packaging & Shipping


Packing:
1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products:
---bundles: timber beam, steel props, tie rod, etc.
---pallet: small parts will be put in bags and then on pallets.
---wooden cases: it is available on customer's request.
---bulk: some irregular goods will be loaded in bulk in container.

Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.

Production Process

Frame /Ringlock Scaffolding Adjustable Hollow Solid Screw Jack Base/ U Head/ Base Jack and Fork Head Jack Leveling Jack

Other Products

Frame /Ringlock Scaffolding Adjustable Hollow Solid Screw Jack Base/ U Head/ Base Jack and Fork Head Jack Leveling Jack

Company Profile

Who we are: JDG SCAFFOLDING is a professional manufacturer of formwork and scaffolding parts for 20 years.
It's located at Cangzhou city near Tianjin port, China.

What we offer:

Adjustable shoring props
Screw jack base and U head
Formwork accessories (tie rod system, rapid clamp, panel lock)
Guard rail
Korean type accessoriesWhy us:

- With 20 years of experience, we know exactly what you need- Customized solution helps you work safe, save cost and convenient- Excellent quality for formwork & scaffolding with wide choices- Fast, flexible in order delivering

JDG SCAFFOLDING, your reliable formwork partner!

 

Certifications

FAQ

Q1: Are you trading company or manufacturer?
A: We are factory.Q2: What do you do?
A: We design and manufacture formwork and scaffolding products used for housing, multi-story structure, buildings, towers, bridges, industrial structures etc.
Q3: What can you do for us?
A: We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.B: We sell our products to the contractors, building companies, material supplier or trading companies.C: We support our worldwide peer companies with our outstanding formwork or scaffolding products.Q4: Do you provide samples? is it free?
A: Yes, we could offer the sample for free charge except for the cost of freight.Q5: How long does it take to make a quotation after we offer the specification or drawing?
A: In general, it will reach you within 24 hours.Q6: How long dose it take to manufacture the products after the signing of contract?
A: In general, it takes 2~5 weeks based on the type and quantity of products to be produced.Q7: What is your terms of payment?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
B: L/C at sight or negotiation according to orders

 

Catrina