En1065 Building Galvanizd Scaffold Heavy Light Duty Telescopic Post Formwork Construction Scaffolding Support/Shoring Adjustable Steel Prop

Products

HomeHome / Products / Steel Props / Details
En1065 Building Galvanizd Scaffold Heavy Light Duty Telescopic Post Formwork Construction Scaffolding Support/Shoring Adjustable Steel Prop

En1065 Building Galvanizd Scaffold Heavy Light Duty Telescopic Post Formwork Construction Scaffolding Support/Shoring Adjustable Steel Prop

PRODUCT DESCRIPTION Prop system Prop is a main part in Formwork project, A complete set of steel prop consists of an inn

Send your inquiry

DESCRIPTION

Basic Info
Model NO. SLM
Residential Wall Structure Supporting Mode
Application Floor Type Scaffolding
Service OEM Service as Well
Color Red/Silver/Blue/Grey
Certificate En1065
Usage Construction & Decoration
Erection Position Internal Scaffolding
Work Load Capacity 20kn & 30kn
Size 1500mm to 5000mm
Payment T/T, L/C
Transport Package Steel Pallet
Specification D48/40mm; D56/48mm; D60/48mm; D76/64mm
Origin China
HS Code 7308400000
Production Capacity 10000PCS/Day
Product Description

PRODUCT DESCRIPTION

Prop system Prop is a main part in Formwork project, A complete set of steel prop consists of an inner tube, an outer tube, a prop nut, a Jack plate and a Base plate. it can be adjusted to any length inside its range. Shoring props are known by several names including: scaffolding prop, formwork prop, industrial prop, building prop, shore prop, acro prop, acro jack, acrow prop and post shores. They are height adjustable by a wide diameter screw thread, which is on the outside of the tube. The use of a screw thread means that the props are able to be tightened when already in place, which allows the user to adjust the load that each one bears.The sizes are available from 1500mm to 5000mm with working bearing load limits from 20kN to 30kN.Feature* Convenient erection with the assistant of tripod* 20kN(D class) & 30kN(E class) at different open lengths for your selection* Anti-dislocation of inner tubes flying out of outer tube* 100mm safe zone design on the top of inner tube avoiding any injury on the hands of users* Hot dip galvanization treatment prevent the prop from corrosion, other treatment like painting and electro galvanization are also available* According to EN 1065 standardApplicationFor shoring purpose, in various kind of slab projects.

Technical Specification

ITEM NO.Closed Length(mm)Open Length(mm)Reference Weight(kg)Work Bearing Capacity
SLMP-D251450250015.120kN
SLMP-D301800300017.120kN
SLMP-D352000350018.920kN
SLMP-D402200400022.220kN
SLMP-D502820500035.220kN
SLMP-E301800300020.030kN
SLMP-E35 2000350024.330kN
SLMP-E402200400026.830kN

PACKING&DELIVERY

1. Production: For full container, normally we need 20-30 days after receive customer's down payment.2. Transportation: It depends on the destination charge port.3. Negotiation is needed for special requirements.

Shandong Shlomi Machinery is a professional supplier since year 2008 which produce the Scaffolding Accessories, Formwork accessories,Shoring Prop which are widely used in wall formwork, slab formwork, column formwork, climbing formwork, slip formwork and all kinds of scaffoldings.We have a strong and highly efficient R&D team which can design and make OEM/ODM products according to your ideas and samples or drawings.We insist on the "superior Quality, Competitive Price" to reach win-win situation with our customers. our main customers come from Europe, the Middle East, Australia, America and the South Africa..

Important Instructions:• Once erection is finished, double-check the props before use.• Respect the prop spacing in accordance with the project.• Prop load capacities and engineer's design must be observed.• The load acting on the prop is vertical and centred. No horizontal loads act on the prop.• Check formwork and prop erection before concrete pouring.• Pouring has to be done from heights which do not cause strong shaking of the formwork or the props.• Avoid the sudden emptying of the concrete bucket onto the formwork.• Formwork stripping and prop removal is only carried out when the concrete strength is sufficiently high.• Before starting any dismantling operation, check the state of the props.• After removal, props should not be irregularly piled up.Packing:1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.2. Different packages are used for different products: ---bundles: timber beam, steel props, tie rod, etc.---pallet: small parts will be put in bags and then on pallets.---wooden cases: it is available on customer's request.---bulk: some irregular goods will be loaded in bulk in container.Delivery:1. Production: For full container, normally we need 20-30 days after receive customer's down payment.2. Transportation: It depends on the destination charge port.3. Negotiation is needed for special requirements. Why us: With 12 years of experience, we know exactly what you need; Strict quality control in raw material selection, production line, and pre-packing, which ensures the reliable product quality as per customer's request. Prompt action on customer's requirments. Shandong Shlomi Machinery welcome friends all over the world !

En1065 Building Galvanizd Scaffold Heavy Light Duty Telescopic Post Formwork Construction Scaffolding Support/Shoring Adjustable Steel Prop