Andamio 230X63 Construction Scaffolding Metal Steel Plank Deck Board Used Aluminum Planks for Sale Andamio Galvanized Perforated Scaffold Steel Plank
Product name: andamio 230x63 construction scaffolding metal steel plankdeck board used aluminum planks for sale andamioG
Send your inquiryDESCRIPTION
Basic Info
Model NO. | andamio 230x63 construction scaffolding metal |
Material | Steel |
Type | Fixed |
Structural Style | Multi-Pole Scaffolding |
Framework | Frame Combined Scaffolding |
Supporting Mode | Projecting Scaffolding |
Lapping Form | Cross Ring Scaffolding |
Erection Position | External Scaffolding |
Move Method | Attached Lifting Scaffolding |
Scaffolding Part Type | Scaffolding Planks |
Construction Properties | Building Scaffold |
Keywords | Steel Plank |
Thickness | 1.0~2.0mm |
Surface 1 | Pre-Galvanized |
Surface 2 | Hot DIP Galvanized(HDG) |
Surface 3 | Powder Coated |
Surface 4 | Color Painted |
Welding Technique | CO2 Arc Welding |
Transport Package | Export Package or According to Customized |
Specification | Length 1000~4000mm, Width 200~500mm |
Trademark | Shengteng |
Origin | Tianjin, China |
Product Description
Product name: andamio 230x63 construction scaffolding metal steel plankdeck board used aluminum planks for sale andamioGALVANIZED PERFORATED SCAFFOLD STEEL PLANK
Place of Origin | Tianjin China (Mainland) | ||||
Size | more customized size available | ||||
Length (mm) | 1000mm | ||||
1500mm | |||||
2000mm | |||||
2500mm | |||||
3000mm | |||||
4000mm | |||||
Width(mm) | 210mm | 240mm | 300mm | 420mm | 480mmm/500mm |
Height(mm) | 38mm | 45mm | 50mm | ||
Thickness(mm) | 1.0mm | 1.1mm | 1.2mm | 1.5mm | 1.8mm/2.0mm |
Material | Q195-Q235 | ||||
Surface Finishing | pre-galvanized (Zinc Coating: 30-60 g/square meter) | ||||
Technique | automatic productive assembly line | ||||
MOQ (Minimum Order Quantity) | 500pcs | ||||
Payment | T/T 30% as deposit, banlace before loading; or L/C at sight | ||||
Package | packed in bulk or in bundle. shipped by container or as client's request | ||||
Production Capacity | 200,000 pcs/month |
1. Normal Steel Plant (can also welded hook) | ||
Size (Width*Height*WT) | Support | Length |
210mm*45mm*1.2mm | Flat, Square | 0.5meter to 5 meter |
225mm*38mm*1.8mm | Flat, Square | 0.5meter to 5 meter |
240mm*45mm*1.2mm | Flat, Square | 0.5meter to 5 meter |
2.Cat walk | |||
Size (Width*Height*WT) | Support | Length | Hooks |
420mm*45mm*1.2mm | Flat, Square | 0.5meter to 5 meter | For 42mm /48.3mm tube |
450mm*45mm*1.2mm | Flat, Square | 0.5meter to 5 meter | For 42mm /48.3mm tube |
480mm*45mm*1.2mm | Flat, Square | 0.5meter to 5 meter | For 42mm /48.3mm tube |
FAQ
1)How manys days can you delivery after confirmed the order?
From stock ,we can shipping within 5-7 days.
For customized of common size, will be delivery in 30 days.
and for specially sizes need to negotiate.
2) What's your payment?
1. 30%TT as deposit, 70% balance against the copy of BL.
2. 100% LC at sight /45 days or 60 days LC
3)What's the product's warranty ?
As long as you received our cargo within 1 years, if you have any problem, pls feedback to us.
After confirmed our quality cause, we will resend new pipes or give reasonable compensation for you.
4) Can I have a trail order ?
Of course, we are gald to make a trail order to show our quality and service.
Getting your satification, we can try more cooperation .
5) Can I have a vist ?
Welcome your visiting ,we can communicate and exchange market information to develop more business.
6) Can you supply other scaffolding materials ?
Yes. All related construction materials.
(1) Scaffolding system
(cup-lock system, ring lock system, scaffolding steel frame, pipe&coupler system)
(2) Scaffolding steel pipes
(3) Steel coupler (pressed/drop forged coupler)
(4) Steel plank with hooks or without hooks
(5) Steel stair case
(6) Screw adjustable base jack
(7) Construction Metal Formwork
QUALITY CONTROL
1)Before Shipping ,Our professional Inspectors Will Check
The Pipe's Diameter,Thickness,Length, Chemical Composition, Mechanical Properties,Zinc Coating etc,
Everything is Ok,
Then Will Shipping and Supply a MTC With Full Information .
2) Support The Third Party Inspection ,SGS, BV and Others.
Tianjin Jinxinbao Mental Surface Treatment Co.,LTD. (Headquarters) Founded in 2012
Tianjin Baojing New Energy Technology Co.,LTD. Founded in 2016
Tianjin Shengteng Internatinal Trading Co.,LTD. Founded in 2018
with the location at the largest welded pipe production based in china-Yangjiayuan Town,Tianjin.
Which is the most professional manufactuer of steel products in this area.
We have total 6 galvanized production lines,
and about 200 employees, annual production more than 200000 tons.
RECOMMEND HOT SALE
Pre-galvanized Steel pipe tube
Hot dip galvanized Steel pipe tube
Black steel pipe tube
ERW steel pipe tube
Scaffolding prop
Scaffolding Frame
Steel plank
Galvanized steel coil
ON SALES→ GALVANIZED STEEL PIPE | ON SALES→SEAMLESS STEEL PIPE |
ON SALES→SQUARE STEEL TUBE | ON SALES→SSAW/LSAW STEEL PIPE |
If you have another question, pls feel free to contact us as below
CONTACT PERSON: KEVIN
Related Products
-
Aluminum Steel Scaffolding Accessory Plank for Ringlock Scaffolding
-
Era Plumbing/Piping Systems Plastic/PVC Pipe Fitting Standard AS/NZS1477 with Watermark Certificate
-
45 Degree Elbow Hope Hot Melt Pipe Fittings DN63-630 Effective Length 63-220mm
-
China Steel Scaffolding Exporter 210 250 300 320mm Galvanized Scaffold Steel Plank